During the project Keel made necessary measurements for cable assemblies. Control box location and cable routes were suggested and approved by customer. In cooperation with crew, all necessary welding works were done. Cable assemblies were terminated and ran according to the plan.
MoreOn-site registration of all Flexible Hose Assemblies (FHAs) on the ultra deepwater drillship, Maersk Voyager, including creation of a hose registry in SAP containing all data regarding hoses and setup of maintenance.
MoreReflection of the changes made to the physical pieces of the equipment in the client’s CMMS (SAP P3M and IFS). Information coordination, CMMS data collection, liaising with the Procurement/Logistic coordinator and Global Stock, communication with the maintenance team and the client, physical verification of equipment, documentation collection, quality control and upload to CMMS; creation and […]
MoreProject took place in 2014-2016 with the scope of 15 Drilling rigs in operation (built from 1988-2010). The primary project objective was to ensure that Preventive maintenance program would help the customer to increase uptime and maintain safe operation on the rigs. The work has been performed according to international standards (ISO14224, NORSOK, IEC, etc.) […]
MoreDevelopment of Functional Location structure for the geared and direct drive turbine platforms (3800 turbines). FLOC/MAT BOM creation with Material Master Enrichment. Performing cleansing of data in accordance with customer’s requirements.
MoreThe transfer covered development packages, ABAP Data Dictionary Objects, Transparent tables, data elements, domains, structures, programs, transactions; custom codes/user exit/ enhancement; Equipment, FunctLoc, Classes and Characteristics, Task lists, Maintenance Plans&Items, Work Permit, Documents.
MoreThe project covered Asset Register and associated preventive maintenance plans development, what was successfully imported into customer’s SAP ERP system. 26700+ EQ and 33800+ FLOCs were enriched with Master Data, BOM and ISO14224 Class characteristics.
MoreManagement Setup
Prior to setting up Initial Warehouse for Rigs, the office work was performed. It included creation of functional structure, creation / extension of materials to newbuildings; identification of Critical Spare Parts for safe operation; future Demand Planning; setting up Consumables Stock for 1Y Safe Operation.
MorePerforms planning, setup and inspections of all installed onboard explosion-proof electrical equipment according to requirements; update Ex register, customer’s system and documentation according results of regular inspections; minor repairs of defected Ex equipment during survey.